MCAS Miramar

Sullivan Solar Power was awarded the MCAS Miramar project in September of 2009. At its completion, a total of 252 solar panels were installed to aid in generating more 47,000 watts of AC power. Sullivan Solar Power's Commercial Team produced the solar power system from concept to completion. The company is dedicated to utilizing developed technology, superior workmanship and products. The team is honored to help MCAS Miramar affirm energy independence.

Performance

This NAVFAC solar power installation by Sullivan Solar Power is part of the solar energy revolution and generating clean, renewable electricity for Strob Construction. On average, each year a solar energy system this size will:

  • Generate 70,800 to 94,400 kilowatt hours of clean renewable solar power.
  • Avoid the creation of 117,056 pounds of harmful carbon dioxide released into our air.
  • Provide the system owner with $20,768 in Solar Power Savings.

Project Details

Zip Code

92121

Type of Mounting

Roof

Solar Panels

Siliken

Inverter

PV Powered

System Size (kW AC)

47.2

Bill Before Solar

$1,000