Photo of San Diego Kyocera KU270-6MCA solar panel installation by Sullivan Solar Power

San Diego Solar Power: High Tech High Point Loma Building 49

Sullivan Solar Power was selected to design, build and install a solar energy system for Building 49 at the High Tech High campus in Point Loma. The 50 kilowatt AC system consists of 212 Kyocera solar panels and is mounted on the roof of the building. It was the second installation our company completed at the Point Loma High Tech High campus, following a 130-kilowatt AC system we installed on the Media Arts building at the nearby K-8 campus. We're proud to be helping today's students and tomorrow's leaders go solar!

On average, each year a solar energy system this size will:

Older
Solar Panels
Kyocera
Inverter
SMA
Bill Before Solar
$0
Mounting
Roof, 4-Flat Roof
Zip
92106
System Size
50 kW