University of California San Diego

The University of California San Diego chose Sullivan Solar Power for two phases of solar installations over a period of four years. The first phase comprised of design engineering, procurement and construction services for five separate solar panel installations on off- campus university properties. UCSD then selected Sullivan Solar Power to design, engineer, procure and construct solar power systems at seven on-campus locations in La Jolla.

In all, we have installed more than 1,500 kilowatts of power across 12 UCSD locations, such as the university's medical center in Hillcrest and the central power plant on campus. All jobs were delivered on time and on budget.

As part of the design, UCSD incorporated electric vehicle charging stations at each site. Clean Renewable Energy Bonds (CREB’s) were used to fund the projects and Sullivan Solar Power will be maintaining and monitoring each site under an ongoing service agreement.

IMG_8555-0.jpg
UCSD Off Campus Sites
Photo of SDGE Campus Pointe Solar Power Installation solar panel installation in San Diego
SDGE Campus Pointe Solar Power Installation
Photo of UCSD Trade St solar panel installation in San Diego
UCSD Trade St
Photo of UCSD Engelkirk and SIO solar panel installation in San Diego
UCSD Engelkirk and SIO
Photo of UCSD Nimitz Marine Facility solar panel installation in San Diego
UCSD Nimitz Marine Facility
Photo of UCSD Bachman Carport solar panel installation in San Diego
UCSD Bachman Carport
Photo of La Jolla SunPower 435W solar panel installation by Sullivan Solar Power at the UCSD Leichtag Biomedical Research Building
UCSD Leichtag Biomedical Research Building